Changes

no edit summary
Line 33: Line 33:  
<div style="padding:10px; font-size:120%; line-height: 1.5em;">
 
<div style="padding:10px; font-size:120%; line-height: 1.5em;">
   −
The project is divided into two (2) phases and consists of a complete overhaul of both the inside and outside of the building. <br>  
+
The project is divided into two phases and consists of a complete overhaul of both the inside and outside of the building. <br>  
 
<br>
 
<br>
 
<b>Phase 1</b> (from 2018 to 2024) is already underway. It will address the interior workplace refit of the western towers C1, C2, D and B3, and common base building systems throughout the complex.
 
<b>Phase 1</b> (from 2018 to 2024) is already underway. It will address the interior workplace refit of the western towers C1, C2, D and B3, and common base building systems throughout the complex.
238

edits