Line 1: |
Line 1: |
− | <!--765e--> | + | '''<big>IMPORTANT: Please note that this site has been replaced by the new [https://www.gcpedia.gc.ca/wiki/PDP3AWR_Home PDP3 AWR Project Portal on GCpedia]; no further updates will be made.</big>'''<!--765e--> |
| [[Image:PDP3_Welcome_Page1.jpg|center|link=]] | | [[Image:PDP3_Welcome_Page1.jpg|center|link=]] |
| <br> | | <br> |
Line 5: |
Line 5: |
| <!--French--> | | <!--French--> |
| {| class="FCK__ShowTableBorders" style="border:white solid 1px; background-color:#551155" width="10%" align="center" | | {| class="FCK__ShowTableBorders" style="border:white solid 1px; background-color:#551155" width="10%" align="center" |
− | | style="padding-right: 5px; padding-left: 5px; padding-bottom: 10px; padding-top: 10px; text-align: center;" | [[Place_du_Portage_III_AWR_French|<span style="color:#ffffff"> '''Français'''</span>]] | + | | style="padding-right: 5px; padding-left: 5px; padding-bottom: 10px; padding-top: 10px; text-align: center;" | [[Renouvellement_de_Portage_III_Phases_du_projet_et_étapes_importantes|<span style="color:#ffffff"> '''Français'''</span>]] |
| |} <br> | | |} <br> |
| | | |
Line 33: |
Line 33: |
| <div style="padding:10px; font-size:120%; line-height: 1.5em;"> | | <div style="padding:10px; font-size:120%; line-height: 1.5em;"> |
| | | |
− | The project is divided into two (2) phases and consists of a complete overhaul of both the inside and outside of the building. <br> | + | The project is divided into two phases and consists of a complete overhaul of both the inside and outside of the building. <br> |
| <br> | | <br> |
− | <b>Phase 1</b> (from 2018 to 2024) is already underway. It will address the interior workplace refit of the western towers C1, C2, D and B3, and common base building systems throughout the complex. | + | <b>Phase 1</b> (from 2018 to 2027) is underway. It will address the interior workplace refit of the western towers (C1, C2, D and B3) by 2024, and common base building systems throughout the complex by 2027. |
| <br><br> | | <br><br> |
− | <b>Phase 2</b> (from 2022 to 2027) will address the interior workplace refit eastern towers A1, A2, B1, B2 and E. | + | <b>Phase 2</b> (from 2024 to 2027) will address the interior workplace refit eastern towers (A1, A2, B1, B2 and E). |
| <br><br> | | <br><br> |
| <b>Key milestones</b><br> | | <b>Key milestones</b><br> |
| | | |
| • Planning and design activities for the PDP3 AWR Project started in 2018 <br> | | • Planning and design activities for the PDP3 AWR Project started in 2018 <br> |
− | • Selective interior demolition work of the western towers began in 2019 and was completed in fall 2021<br> | + | • Selective interior demolition work of the western towers began in 2019 and was completed in 2021<br> |
| • Construction activities started in early 2022 <br> | | • Construction activities started in early 2022 <br> |
| • The project is expected to be completed in 2027 <br> | | • The project is expected to be completed in 2027 <br> |