Changes

no edit summary
Line 41: Line 41:  
* 4 basement levels<br>  
 
* 4 basement levels<br>  
 
* a 3-level underground parking garage  <br>
 
* a 3-level underground parking garage  <br>
   
+
  <br>
 
The project includes replacing base building systems, such as windows, the building exterior (also known as the building envelope), plumbing, electrical systems, and heating and cooling systems. It also includes modernizing the interior workplace, updating security systems, and installing new information technology.<br>  
 
The project includes replacing base building systems, such as windows, the building exterior (also known as the building envelope), plumbing, electrical systems, and heating and cooling systems. It also includes modernizing the interior workplace, updating security systems, and installing new information technology.<br>  
 
+
<br>
 
The project considers '''GoC priorities''', including: <br>  
 
The project considers '''GoC priorities''', including: <br>  
   Line 51: Line 51:  
* inclusivity, including reaching out to Indigenous people <br>
 
* inclusivity, including reaching out to Indigenous people <br>
 
* wellness <br>
 
* wellness <br>
 
+
<br>
 
The renewed PDP3 building is being designed to meet the modern workplace standard for the GoC known as [https://www.tpsgc-pwgsc.gc.ca/biens-property/mt-wp/mt-wp-eng.html GCworkplace] which offers greater flexibility in where and how people work and suits the needs of a hybrid, post-pandemic workforce.
 
The renewed PDP3 building is being designed to meet the modern workplace standard for the GoC known as [https://www.tpsgc-pwgsc.gc.ca/biens-property/mt-wp/mt-wp-eng.html GCworkplace] which offers greater flexibility in where and how people work and suits the needs of a hybrid, post-pandemic workforce.
 
<br><br>
 
<br><br>
238

edits