The PDP3 AWR project consists of a complete overhaul of both the inside and outside of the building. As part of the planned midlife renewal work, we are doing much-needed renovations and are replacing systems that have reached the end of their useful life. <br>
     −
The project includes:<br>
+
The PDP3 AWR project consists of a complete overhaul of both the inside and outside of the building. As part of the planned midlife renewal work, we are doing much-needed renovations and are replacing systems that have reached the end of their useful life. The project includes:<br>
    
• replacing base building systems, such as windows, the building exterior (also known as the building envelope), plumbing, electrical systems, heating and cooling systems.<br>
 
• replacing base building systems, such as windows, the building exterior (also known as the building envelope), plumbing, electrical systems, heating and cooling systems.<br>
Line 49: Line 47:  
• installing new information technology<br>  
 
• installing new information technology<br>  
   −
The project considers GoC priorities, including: <br>  
+
The project considers '''GoC priorities''', including: <br>  
    
• greening <br>
 
• greening <br>