Changes

196 bytes added ,  06:38, 7 September 2018
no edit summary
Line 69: Line 69:  
* Presentation: [[File:Draft EPS HLD Workshop Slides Week 2 Day4 v2.pptx]]
 
* Presentation: [[File:Draft EPS HLD Workshop Slides Week 2 Day4 v2.pptx]]
 
* Minutes: [[File:HLD Minutes August 30 2018.pdf]]
 
* Minutes: [[File:HLD Minutes August 30 2018.pdf]]
 +
    
== Week 3: Fit-Gap Analysis and Requirements Validation ==
 
== Week 3: Fit-Gap Analysis and Requirements Validation ==
 
* English Agenda:[[File:Agenda EPS workshop week 3 ENG.pdf]]
 
* English Agenda:[[File:Agenda EPS workshop week 3 ENG.pdf]]
 
* French Agenda: [[File:Agenda EPS workshop week 3 FRA.pdf]]
 
* French Agenda: [[File:Agenda EPS workshop week 3 FRA.pdf]]
 +
 +
=== September 4th: Deep-Dive Discussion ===
 +
Session Objective: In-depth discussions with solution architecture team, finance, and stakeholders from CRA.
 +
* Minutes:[[File:EPS HLD September 4 2018.pdf]]
    
=== September 5th(AM): Ariba/Fieldglass Demos (Acquisitions Program + OGDs) ===  
 
=== September 5th(AM): Ariba/Fieldglass Demos (Acquisitions Program + OGDs) ===  
 
Session Objective: Demo of Ariba and Fieldglass solutions demonstrating the capabilities of the software. These demos are intended to act as a reference for participants going into future state design workshops. Through these demonstration, the project team will demonstrate out of the box functionality which will not be representative of the future state for GC EPS solution.  
 
Session Objective: Demo of Ariba and Fieldglass solutions demonstrating the capabilities of the software. These demos are intended to act as a reference for participants going into future state design workshops. Through these demonstration, the project team will demonstrate out of the box functionality which will not be representative of the future state for GC EPS solution.  
* Link to presentation
+
* Link to WebEx Presentation Coming Soon
* Link to meeting minutes
+
 
    
=== September 5th(PM): Supplier Enablement (External) ===
 
=== September 5th(PM): Supplier Enablement (External) ===