Changes

Line 59: Line 59:  
* Note: The checklist of criteria applied in the assessments is found in the appendices of the [[Images/4/49/GC EARB Presenter GENERAL 2019-09-13.PPTX|GC EARB Presenter Template (gccollab.ca)]] used for departmental submissions to GC EARB. (to be updated soon when the EA Framework is published)
 
* Note: The checklist of criteria applied in the assessments is found in the appendices of the [[Images/4/49/GC EARB Presenter GENERAL 2019-09-13.PPTX|GC EARB Presenter Template (gccollab.ca)]] used for departmental submissions to GC EARB. (to be updated soon when the EA Framework is published)
   −
* Would the client department benefit from an engagement with the GC Enterprise Architecture team to help draft the GC EARB presenter template for the project?
+
** Would the client department benefit from an engagement with the GC Enterprise Architecture team to help draft the [[:en:images/b/bb/2020-12-15-GC_EARB_Presenter_GENERAL.pptx|GC EARB presenter template]] for the project?
    
* Is there an existing [[GC Enterprise Architecture/Enterprise Solutions|Enterprise Solution]] that can be leveraged by the project?
 
* Is there an existing [[GC Enterprise Architecture/Enterprise Solutions|Enterprise Solution]] that can be leveraged by the project?