Changes

no edit summary
Line 39: Line 39:  
* 4 basement levels<br>  
 
* 4 basement levels<br>  
 
* a 3-level underground parking garage  <br>
 
* a 3-level underground parking garage  <br>
 
+
<br>
 
The PDP3 AWR project consists of a complete overhaul of both the inside and outside of the building. As part of the planned midlife renewal work, we are doing much-needed renovations and are replacing systems that have reached the end of their useful life. The project includes:<br>
 
The PDP3 AWR project consists of a complete overhaul of both the inside and outside of the building. As part of the planned midlife renewal work, we are doing much-needed renovations and are replacing systems that have reached the end of their useful life. The project includes:<br>
  
238

edits