Difference between revisions of "GCcollab Renewal Sprint Goals"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
This page contains the Goals for the upcoming sprints. | This page contains the Goals for the upcoming sprints. | ||
+ | |||
+ | === Sprint 5 - August 22nd - September 2nd === | ||
+ | |||
+ | * Research and options analysis for frontend solution | ||
+ | * Research and options analysis for backend solution | ||
+ | * GCcollab bugs | ||
+ | * Information architecture and card sorting | ||
+ | * Design updated page architecture with Heuristic and a11y testing results | ||
+ | * Build backlog and roadmap in Github Projects | ||
=== Sprint 4 - August 8th - August 19th === | === Sprint 4 - August 8th - August 19th === |
Revision as of 13:39, 18 August 2022
This page contains the Goals for the upcoming sprints.
Sprint 5 - August 22nd - September 2nd
- Research and options analysis for frontend solution
- Research and options analysis for backend solution
- GCcollab bugs
- Information architecture and card sorting
- Design updated page architecture with Heuristic and a11y testing results
- Build backlog and roadmap in Github Projects
Sprint 4 - August 8th - August 19th
- Research and options analysis for frontend solution
- Research and options analysis for backend solution
- GCcollab bugs
- Begin user research
- Design updated page architecture with Heuristic and a11y testing results
- Build backlog and roadmap in Github Projects
Sprint 3 - July 25th - August 5th
- Research and options analysis for frontend solution
- Research and options analysis for backend solution
- GCcollab bugs
- Begin user research
- Heuristic UX review of GCcollab
- A11y testing
- Build backlog and roadmap in Github Projects
Sprint 2 - July 11th - July 22nd
- Create a high level one page requirements document on technical direction for GCcollab
- Research and options analysis for frontend solution
- Research and options analysis for backend solution
- Begin user research
- Build backlog and roadmap in Github Projects
Sprint 1 - June 27th - July 8th
- Create a high level one page requirements document on technical direction for GCcollab
- Research and brainstorm technical options
- Research and brainstorm GCcollab strategy
- Begin user research
- Build out the backlog based on technical requirements and user research