− | The project is divided into two (2) phases and consists of a complete overhaul of both the inside and outside of the building. <br> | + | The project is divided into two phases and consists of a complete overhaul of both the inside and outside of the building. <br> |
| <br> | | <br> |
− | <b>Phase 1</b> (from 2018 to 2024) is already underway. It will address the interior workplace refit of the western towers C1, C2, D and B3, and common base building systems throughout the complex. | + | <b>Phase 1</b> (from 2018 to 2027) is underway. It will address the interior workplace refit of the western towers (C1, C2, D and B3) by 2024, and common base building systems throughout the complex by 2027. |
| <br><br> | | <br><br> |
− | <b>Phase 2</b> (from 2022 to 2027) will address the interior workplace refit eastern towers A1, A2, B1, B2 and E. | + | <b>Phase 2</b> (from 2024 to 2027) will address the interior workplace refit eastern towers (A1, A2, B1, B2 and E). |
| <br><br> | | <br><br> |
| <b>Key milestones</b><br> | | <b>Key milestones</b><br> |