Difference between revisions of "Place du Portage III AWR Project phases and milestones"
Layal.eshak (talk | contribs) |
|||
(7 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
− | <!--765e--> | + | '''<big>IMPORTANT: Please note that this site has been replaced by the new [https://www.gcpedia.gc.ca/wiki/PDP3AWR_Home PDP3 AWR Project Portal on GCpedia]; no further updates will be made.</big>'''<!--765e--> |
[[Image:PDP3_Welcome_Page1.jpg|center|link=]] | [[Image:PDP3_Welcome_Page1.jpg|center|link=]] | ||
<br> | <br> | ||
Line 5: | Line 5: | ||
<!--French--> | <!--French--> | ||
{| class="FCK__ShowTableBorders" style="border:white solid 1px; background-color:#551155" width="10%" align="center" | {| class="FCK__ShowTableBorders" style="border:white solid 1px; background-color:#551155" width="10%" align="center" | ||
− | | style="padding-right: 5px; padding-left: 5px; padding-bottom: 10px; padding-top: 10px; text-align: center;" | [[ | + | | style="padding-right: 5px; padding-left: 5px; padding-bottom: 10px; padding-top: 10px; text-align: center;" | [[Renouvellement_de_Portage_III_Phases_du_projet_et_étapes_importantes|<span style="color:#ffffff"> '''Français'''</span>]] |
|} <br> | |} <br> | ||
Line 33: | Line 33: | ||
<div style="padding:10px; font-size:120%; line-height: 1.5em;"> | <div style="padding:10px; font-size:120%; line-height: 1.5em;"> | ||
− | The project is divided into two | + | The project is divided into two phases and consists of a complete overhaul of both the inside and outside of the building. <br> |
<br> | <br> | ||
− | <b>Phase 1</b> (from 2018 to | + | <b>Phase 1</b> (from 2018 to 2027) is underway. It will address the interior workplace refit of the western towers (C1, C2, D and B3) by 2024, and common base building systems throughout the complex by 2027. |
<br><br> | <br><br> | ||
− | <b>Phase 2</b>(from | + | <b>Phase 2</b> (from 2024 to 2027) will address the interior workplace refit eastern towers (A1, A2, B1, B2 and E). |
<br><br> | <br><br> | ||
<b>Key milestones</b><br> | <b>Key milestones</b><br> | ||
• Planning and design activities for the PDP3 AWR Project started in 2018 <br> | • Planning and design activities for the PDP3 AWR Project started in 2018 <br> | ||
− | • Selective interior demolition work of the western towers began in 2019 and was completed in | + | • Selective interior demolition work of the western towers began in 2019 and was completed in 2021<br> |
• Construction activities started in early 2022 <br> | • Construction activities started in early 2022 <br> | ||
• The project is expected to be completed in 2027 <br> | • The project is expected to be completed in 2027 <br> |
Latest revision as of 15:24, 29 March 2023
IMPORTANT: Please note that this site has been replaced by the new PDP3 AWR Project Portal on GCpedia; no further updates will be made.
Français |
Project overview | Project phases and milestones | Objectives and benefits | Notices to building occupants | More information |
Project phases and milestones
The project is divided into two phases and consists of a complete overhaul of both the inside and outside of the building.
Phase 1 (from 2018 to 2027) is underway. It will address the interior workplace refit of the western towers (C1, C2, D and B3) by 2024, and common base building systems throughout the complex by 2027.
Phase 2 (from 2024 to 2027) will address the interior workplace refit eastern towers (A1, A2, B1, B2 and E).
Key milestones
• Planning and design activities for the PDP3 AWR Project started in 2018
• Selective interior demolition work of the western towers began in 2019 and was completed in 2021
• Construction activities started in early 2022
• The project is expected to be completed in 2027