Changes

Line 49: Line 49:  
|To remove, then relocate the fiber optic cables, including conduits and boxes that control the garage door openers within the Laurier-Taché parking garage. The conduits and boxes are currently located in L02 in Tower C on a block wall that is scheduled to be demolished.  
 
|To remove, then relocate the fiber optic cables, including conduits and boxes that control the garage door openers within the Laurier-Taché parking garage. The conduits and boxes are currently located in L02 in Tower C on a block wall that is scheduled to be demolished.  
 
|-
 
|-
|'''[https://wiki.gccollab.ca/images/8/84/CN53_Construction_Hoarding_Tower_B1_L4_L8.F2.pdf Towers B1: Delineation and Hoarding Wall]'''
+
|'''[https://wiki.gccollab.ca/images/8/84/CN53_Construction_Hoarding_Tower_B1_L4_L8.F2.pdf Tower B1: Delineation and Hoarding Wall]'''
 
|December 23, 2022
 
|December 23, 2022