Difference between revisions of "GC Enterprise Architecture/Board/When to come"

From wiki
Jump to navigation Jump to search
Line 23: Line 23:
  
 
= What do I do first? =
 
= What do I do first? =
<br>
+
 
 
<!-- Row-->
 
<!-- Row-->
 
<!-- ROW 1 STARTS: -->  
 
<!-- ROW 1 STARTS: -->  
{| width="100% cellpadding="10" cellspacing=15px
+
{| width="100%" cellpadding="10" cellspacing=15px
  
 
|-valign="top"
 
|-valign="top"
|width="25%" style="border: 1px solid LightBlue; color: black; background-color: AliceBlue;" |  
+
|width="25%" style="border: 1px solid steelblue; color: black; background-color: AliceBlue; font-size:1.2em;" |  
  
1. Conduct a <b>self-assessment</b> of your initiative against the "Criteria" to determine if you should be presenting to the GC EARB.
+
1. Conduct a <b>self-assessment</b> of your initiative against the "Criteria" to determine if you should be presenting to the GC EARB
 
|}
 
|}
{| width="100% cellpadding="10" cellspacing=15px
+
{| width="100%" cellpadding="10" cellspacing=15px
 
|-valign="top"
 
|-valign="top"
|width="25%" style="border: 1px dashed LightBlue;" |  
+
|width="25%" style="border: 1px dashed steelblue;" |  
  
<b>CRITERIA</b>:[https://www.tbs-sct.gc.ca/pol/doc-eng.aspx?id=15249 https://www.tbs-sct.gc.ca/pol/doc-eng.aspx?id=15249]
+
<b>CRITERIA</b>: [https://www.tbs-sct.gc.ca/pol/doc-eng.aspx?id=15249 https://www.tbs-sct.gc.ca/pol/doc-eng.aspx?id=15249]
  
 
*Proposals concerned with the design, development, installation and implementation of digital services or solutions, information systems and applications ("digital initiatives") where the department is willing to invest a minimum of the following amounts in order to address the problem or take advantage of the opportunity:
 
*Proposals concerned with the design, development, installation and implementation of digital services or solutions, information systems and applications ("digital initiatives") where the department is willing to invest a minimum of the following amounts in order to address the problem or take advantage of the opportunity:
Line 72: Line 72:
 
<!-- ROW 1 ENDS: -->  
 
<!-- ROW 1 ENDS: -->  
  
 +
<!-- ROW 2 STARTS: -->
 +
{| width="100%" cellpadding="10" cellspacing=15px
 +
 +
|-valign="top"
 +
|width="25%" style="border: 1px solid steelblue; color: black; background-color: AliceBlue; font-size:1.2em;" |
 +
 +
2.  <b>Complete</b> the "Presenter" intake presentation
 +
|}
 +
{| width="100%" cellpadding="10" cellspacing=15px
 +
|-valign="top"
 +
|width="25%" style="border: 1px dashed steelblue;" |
 +
 +
<b>TEMPLATE</b>:[http://www.gcpedia.gc.ca/wiki/GC_Enterprise_Architecture_Review_Board_(GC_EARB) http://www.gcpedia.gc.ca/wiki/GC_Enterprise_Architecture_Review_Board_(GC_EARB)]
 +
|}
 +
<!-- ROW 2 ENDS: -->
 +
 +
<!-- ROW 3 STARTS: -->
 +
{| width="100%" cellpadding="10" cellspacing=15px
 +
 +
|-valign="top"
 +
|width="25%" style="border: 1px solid steelblue; color: black; background-color: AliceBlue; font-size:1.2em;" |
 +
 +
3. <b>Send</b> completed presentation to GC EARB group
 +
|}
 +
{| width="100%" cellpadding="10" cellspacing=15px
 +
|-valign="top"
 +
|width="25%" style="border: 1px dashed steelblue;" |
 +
 +
<b>EMAIL</b>: {{ZZCIOBDP@tbs-sct.gc.ca}}
 +
|}
 +
<!-- ROW 3 ENDS: -->
 +
 +
 +
==Things to note==
 +
 +
* Ensure that all proposals submitted for review to GC EARB have first been assessed by your <b>DARB</b> (Departmental Architecture Review Board) where one has been established.
 +
* Ensure your departmental initiatives are assessed against and <b>align</b> to the requirements set out as the [GC Architectural Standards].
 +
 +
 +
==How do you go about getting on the agenda?==
 +
 +
* Complete the presenter intake deck.
 +
* Email the deck to the generic mailbox: {{ZZCIOBDP@tbs-sct.gc.ca}}
 +
* GC Enterprise Architecture will review and conduct initial assessment.
 +
* Tentative date to present is secured and you will be notified by email.
 +
 +
 +
==Architectural Assessment==
 +
 +
* GC Enterprise Architecture will review your project material against the [GC Digital] and [GC Architectural Standards].
 +
* A summary is prepared that notes areas of alignment and areas of possible concern.
 +
* This summary is shared with the departmental contacts and the EARB Co-Chairs prior to the meeting.
 +
 +
 +
==Meeting Logistics – How It Works==
 +
 +
<span style="font-size: 1.2em; font-weight: bold;"> TBS OCIO Secretariat </span>
 +
 +
<b>2 weeks</b> ahead:
 +
* The Secretariat will extend the calendar invitations to the presenters (typically 1-2 people)
  
 +
<b>1 week</b> ahead:
 +
* FINAL presentation materials (both French and English) are required.
 +
* Packages are prepared and distributed to EARB members for their review prior to the scheduled meeting.
  
 +
<b>Day of:</b>
 +
* Present yourself to the separate security TABLE and see the OCIO Secretariat Representative.  (Note:  It is recommended to arrive 15 minutes prior to the meeting)
 +
* You will be signed in and provided a temporary security pass.
 +
* Make your way to the identified meeting room.
 +
* Once in the meeting room, please RETURN the temporary pass to OCIO representatives.
  
 +
<b>Post EARB Meeting:</b>
 +
* A Record of Discussion (RoD) is prepared after the meeting to capture any highlights that the Board noted, as well as the decision of the Board with any conditions.
 +
* The RoD may take several weeks to be officially published, but will be made available on the GC Wiki site.
  
  

Revision as of 10:19, 9 January 2019

Government of Canada Enterprise Architecture Review Board Logo


Home What is EARB When to come to EARB EARB Process Forward Agenda Past Sessions


What do I do first?

1. Conduct a self-assessment of your initiative against the "Criteria" to determine if you should be presenting to the GC EARB

CRITERIA: https://www.tbs-sct.gc.ca/pol/doc-eng.aspx?id=15249

  • Proposals concerned with the design, development, installation and implementation of digital services or solutions, information systems and applications ("digital initiatives") where the department is willing to invest a minimum of the following amounts in order to address the problem or take advantage of the opportunity:
  • $2.5 million + OPMCA of 0 or 1
  • $5 million + OPMCA of 2
  • $10 million + OPMCA of 3
  • $15 million Department of National Defence
  • $25 million + OPMCA of 4
  • That involve emerging technologies;
  • That require an exception to any applicable Directive or Standard under the Policy on the Management of Information Technology;
  • That are categorized at the protected B level or below‎ using a deployment model other than public cloud for application hosting (including infrastructure), application deployment, or application development; or
  • As directed by the Chief Information Officer of Canada.

2. Complete the "Presenter" intake presentation

TEMPLATE:http://www.gcpedia.gc.ca/wiki/GC_Enterprise_Architecture_Review_Board_(GC_EARB)

3. Send completed presentation to GC EARB group

EMAIL: Template:ZZCIOBDP@tbs-sct.gc.ca


Things to note

  • Ensure that all proposals submitted for review to GC EARB have first been assessed by your DARB (Departmental Architecture Review Board) where one has been established.
  • Ensure your departmental initiatives are assessed against and align to the requirements set out as the [GC Architectural Standards].


How do you go about getting on the agenda?

  • Complete the presenter intake deck.
  • Email the deck to the generic mailbox: Template:ZZCIOBDP@tbs-sct.gc.ca
  • GC Enterprise Architecture will review and conduct initial assessment.
  • Tentative date to present is secured and you will be notified by email.


Architectural Assessment

  • GC Enterprise Architecture will review your project material against the [GC Digital] and [GC Architectural Standards].
  • A summary is prepared that notes areas of alignment and areas of possible concern.
  • This summary is shared with the departmental contacts and the EARB Co-Chairs prior to the meeting.


Meeting Logistics – How It Works

TBS OCIO Secretariat

2 weeks ahead:

  • The Secretariat will extend the calendar invitations to the presenters (typically 1-2 people)

1 week ahead:

  • FINAL presentation materials (both French and English) are required.
  • Packages are prepared and distributed to EARB members for their review prior to the scheduled meeting.

Day of:

  • Present yourself to the separate security TABLE and see the OCIO Secretariat Representative. (Note: It is recommended to arrive 15 minutes prior to the meeting)
  • You will be signed in and provided a temporary security pass.
  • Make your way to the identified meeting room.
  • Once in the meeting room, please RETURN the temporary pass to OCIO representatives.

Post EARB Meeting:

  • A Record of Discussion (RoD) is prepared after the meeting to capture any highlights that the Board noted, as well as the decision of the Board with any conditions.
  • The RoD may take several weeks to be officially published, but will be made available on the GC Wiki site.


Useful Links