Difference between revisions of "Renouvellement de Portage III Phases du projet et étapes importantes"
Layal.eshak (talk | contribs) |
Layal.eshak (talk | contribs) |
||
Line 5: | Line 5: | ||
<!--French--> | <!--French--> | ||
{| class="FCK__ShowTableBorders" style="border:white solid 1px; background-color:#551155" width="10%" align="center" | {| class="FCK__ShowTableBorders" style="border:white solid 1px; background-color:#551155" width="10%" align="center" | ||
− | | style="padding-right: 5px; padding-left: 5px; padding-bottom: 10px; padding-top: 10px; text-align: center;" | [[ | + | | style="padding-right: 5px; padding-left: 5px; padding-bottom: 10px; padding-top: 10px; text-align: center;" | [[Place_du_Portage_III_AWR_Project_phases_and_milestones|<span style="color:#ffffff"> '''English'''</span>]] |
|} <br> | |} <br> | ||
Revision as of 19:10, 21 April 2022
English |
Aperçu du projet | Phases du projet et étapes importantes | Objectifs et avantages | Avis aux occupants du bâtiment | Renseignements supplémentaires |
Phases du projet et étapes importantes
The project is divided into two (2) phases and consists of a complete overhaul of both the inside and outside of the building.
Phase 1 (from 2018 to 2024) is already underway. It will address the interior workplace refit of the western towers C1, C2, D and B3, and common base building systems throughout the complex.
Phase 2 (from 2022 to 2027) will address the interior workplace refit eastern towers A1, A2, B1, B2 and E.
Key milestones
• Planning and design activities for the PDP3 AWR Project started in 2018
• Selective interior demolition work of the western towers began in 2019 and was completed in 2021
• Construction activities started in early 2022
• The project is expected to be completed in 2027