Difference between revisions of "Renouvellement de Portage III Aperçu du projet"

From wiki
Jump to navigation Jump to search
(Created page with "<!--765e--> center|link= <br> <!--French--> {| class="FCK__ShowTableBorders" style="border:white solid 1px; background-color:#551155" width="...")
 
Line 28: Line 28:
  
 
<!-- Information box -->
 
<!-- Information box -->
{{Main page box (left)|border-color=#73AFC0|background=#73AFC0|title-colour=black|title=<b>Bienvenue</b>||content=
+
{{Main page box (left)|border-color=#73AFC0|background=#73AFC0|title-colour=black|title=<b>Aperçu du projet</b>||content=
  
 
<!--Infos in main main box-->
 
<!--Infos in main main box-->
 
<div style="padding:10px; font-size:120%; line-height: 1.5em;">
 
<div style="padding:10px; font-size:120%; line-height: 1.5em;">
  
Welcome to the home page of the Place du Portage III (PDP3) Asset and Workplace Renewal (AWR) project.
+
The PDP3 AWR project consists of a complete overhaul of both the inside and outside of the building. As part of the planned midlife renewal work, we are doing much-needed renovations and are replacing systems that have reached the end of their useful life. <br>
 +
<br>
 +
The Place du Portage complex was built in the 1970s and consists of: <br>
  
The Government of Canada (GoC) is investing in key strategic assets, including in Place du Portage III (PDP3), to provide federal public servants with workplaces that are modern, sustainable, healthy, safe, accessible and collaborative.<br>
+
* 9 towers <br>
 +
* commercial areas<br>
 +
* 4 basement levels<br>
 +
* a 3-level underground parking garage  <br>
  
The PDP3 complex is the largest of four (4) buildings that constitute "Place du Portage". It is a recognized federal heritage building located on the National Capital's ceremonial route, "the Confederation Boulevard", and it is undergoing a major rehabilitation.<br> 
 
  
The PDP3 AWR project will demonstrate the Government of Canada (GoC)'s commitment to greening and environmental sustainability. It will incorporate elements such as a high-efficiency building envelope, smart building features, LED lighting, improved insulation, modern high efficiency heating, cooling and ventilation systems, and so much more.<br>
+
The project includes replacing base building systems, such as windows, the building exterior (also known as the building envelope), plumbing, electrical systems, and heating and cooling systems. It also includes modernizing the interior workplace, updating security systems, and installing new information technology.<br>  
 
+
<br>
Click on the links below to learn more about the work underway: <br>  
+
The project considers '''GoC priorities''', including: <br>  
  
• [[Renouvellement_de_Portage_III_Aperçu_du_projet | Aperçu du projet]] <br>
+
* greening <br>
[[Renouvellement_de_Portage_III_Phases_du_projet_et_étapes_importantes | Phases du projet et étapes importantes]] <br>
+
* [https://women-gender-equality.canada.ca/en/gender-based-analysis-plus.html Gender-based Analysis Plus (GBA+)] measures<br>
• [[Renouvellement_de_Portage_III_Objectifs_et_avantages | Objectifs et avantages]] <br>  
+
* universal accessibility <br>  
• [[Renouvellement_de_Portage_III_Avis_aux_occupants_du_bâtiment | Avis aux occupants du bâtiment]] <br>
+
* inclusivity, including reaching out to Indigenous people <br>
• [[Renouvellement_de_Portage_III_Renseignements_supplémentaires | Renseignements supplémentaires]] <br>
+
* wellness <br>
<br>
 
For more information about Public Services and Procurement Canada's (PSPC) Real Property Services, the Government of Canada's real property expert, please click here: https://www.tpsgc-pwgsc.gc.ca/biens-property/index-eng.html
 
 
<br>
 
<br>
 +
The renewed PDP3 building is being designed to meet the modern workplace standard for the GoC known as [https://www.tpsgc-pwgsc.gc.ca/biens-property/mt-wp/mt-wp-eng.html GCworkplace] which offers greater flexibility in where and how people work and suits the needs of a hybrid, post-pandemic workforce.
 +
<br><br>
 +
<u><small>[[Place_du_Portage_III_Asset_and_Workplace_Renewal_Project| <i>Back to Welcome Page</I>]]</small></u><br>
 
</div>
 
</div>
 
}}
 
}}
 
</div>
 
</div>
 
</div>
 
</div>

Revision as of 18:47, 21 April 2022

PDP3 Welcome Page1.jpg


English


Aperçu du projet Phases du projet et étapes importantes Objectifs et avantages Avis aux occupants du bâtiment Renseignements supplémentaires

Aperçu du projet

The PDP3 AWR project consists of a complete overhaul of both the inside and outside of the building. As part of the planned midlife renewal work, we are doing much-needed renovations and are replacing systems that have reached the end of their useful life.

The Place du Portage complex was built in the 1970s and consists of:

  • 9 towers
  • commercial areas
  • 4 basement levels
  • a 3-level underground parking garage


The project includes replacing base building systems, such as windows, the building exterior (also known as the building envelope), plumbing, electrical systems, and heating and cooling systems. It also includes modernizing the interior workplace, updating security systems, and installing new information technology.

The project considers GoC priorities, including:


The renewed PDP3 building is being designed to meet the modern workplace standard for the GoC known as GCworkplace which offers greater flexibility in where and how people work and suits the needs of a hybrid, post-pandemic workforce.

Back to Welcome Page