Difference between revisions of "Place du Portage III AWR Project overview"

From wiki
Jump to navigation Jump to search
Line 41: Line 41:
 
* 4 basement levels<br>  
 
* 4 basement levels<br>  
 
* a 3-level underground parking garage  <br>
 
* a 3-level underground parking garage  <br>
   
+
  <br>
 
The project includes replacing base building systems, such as windows, the building exterior (also known as the building envelope), plumbing, electrical systems, and heating and cooling systems. It also includes modernizing the interior workplace, updating security systems, and installing new information technology.<br>  
 
The project includes replacing base building systems, such as windows, the building exterior (also known as the building envelope), plumbing, electrical systems, and heating and cooling systems. It also includes modernizing the interior workplace, updating security systems, and installing new information technology.<br>  
 
+
<br>
 
The project considers '''GoC priorities''', including: <br>  
 
The project considers '''GoC priorities''', including: <br>  
  
Line 51: Line 51:
 
* inclusivity, including reaching out to Indigenous people <br>
 
* inclusivity, including reaching out to Indigenous people <br>
 
* wellness <br>
 
* wellness <br>
 
+
<br>
 
The renewed PDP3 building is being designed to meet the modern workplace standard for the GoC known as [https://www.tpsgc-pwgsc.gc.ca/biens-property/mt-wp/mt-wp-eng.html GCworkplace] which offers greater flexibility in where and how people work and suits the needs of a hybrid, post-pandemic workforce.
 
The renewed PDP3 building is being designed to meet the modern workplace standard for the GoC known as [https://www.tpsgc-pwgsc.gc.ca/biens-property/mt-wp/mt-wp-eng.html GCworkplace] which offers greater flexibility in where and how people work and suits the needs of a hybrid, post-pandemic workforce.
 
<br><br>
 
<br><br>

Revision as of 16:07, 21 April 2022

PDP3 Welcome Page1.jpg


Français


Project overview Project phases and milestones Objectives and benefits Notices to building occupants More information

Project Overview

The PDP3 AWR project consists of a complete overhaul of both the inside and outside of the building. As part of the planned midlife renewal work, we are doing much-needed renovations and are replacing systems that have reached the end of their useful life.

The Place du Portage complex was built in the 1970s and consists of:

  • 9 towers
  • commercial areas
  • 4 basement levels
  • a 3-level underground parking garage

The project includes replacing base building systems, such as windows, the building exterior (also known as the building envelope), plumbing, electrical systems, and heating and cooling systems. It also includes modernizing the interior workplace, updating security systems, and installing new information technology.

The project considers GoC priorities, including:


The renewed PDP3 building is being designed to meet the modern workplace standard for the GoC known as GCworkplace which offers greater flexibility in where and how people work and suits the needs of a hybrid, post-pandemic workforce.

Back to Welcome Page