The Place du Portage complex was built in the 1970s. This project consists of a complete overhaul of both the inside and outside of the building which consists of: <br>  
+
The Place du Portage complex was built in the 1970s. As part of planned midlife renewal work, we are doing much-needed renovations, and replacing systems that have reached the end of their useful life. In fact, this project consists of a complete overhaul of both the inside and outside of the building which includes: <br>  
  
 
• 9 towers <br>
 
• 9 towers <br>
Line 40: Line 40:
 
• a 3-level underground parking garage  <br>
 
• a 3-level underground parking garage  <br>
 
<br>
 
<br>
As part of planned midlife renewal work, we are doing much-needed renovations, and replacing systems that have reached the end of their useful life.
+
 
 
<br><br>
 
<br><br>
 
The Government of Canada (GoC) is investing in key strategic assets, including in PDP3, to provide federal public servants with workplaces that are modern, sustainable, healthy, safe, accessible and collaborative.
 
The Government of Canada (GoC) is investing in key strategic assets, including in PDP3, to provide federal public servants with workplaces that are modern, sustainable, healthy, safe, accessible and collaborative.
 
<br><br>
 
<br><br>
The PDP3 project considers Government of Canada (GC) priorities, including: <br>  
+
The project considers GoC priorities, including: <br>  
  
 
• greening <br>
 
• greening <br>
Line 52: Line 52:
 
• wellness <br>
 
• wellness <br>
 
<br>
 
<br>
The renewed PDP3 building is being designed to meet the modern workplace standard for the GC known as [https://www.tpsgc-pwgsc.gc.ca/biens-property/mt-wp/mt-wp-eng.html GCworkplace] which offers greater flexibility in where and how people work and suits the needs of a post-pandemic, hybrid workforce.
+
The renewed PDP3 building is being designed to meet the modern workplace standard for the GoC known as [https://www.tpsgc-pwgsc.gc.ca/biens-property/mt-wp/mt-wp-eng.html GCworkplace] which offers greater flexibility in where and how people work and suits the needs of a post-pandemic, hybrid workforce.
 
<br><br>
 
<br><br>
 
<u><small>[[Place_du_Portage_III_Asset_and_Workplace_Renewal_Project| <i>Back to Welcome Page</I>]]</small></u><br>
 
<u><small>[[Place_du_Portage_III_Asset_and_Workplace_Renewal_Project| <i>Back to Welcome Page</I>]]</small></u><br>

Revision as of 11:01, 20 April 2022

PDP3 Welcome Page1.jpg


Français


Project overview Project phases and milestones Objectives and benefits Notices to building occupants More information

Project Overview

The Place du Portage complex was built in the 1970s. As part of planned midlife renewal work, we are doing much-needed renovations, and replacing systems that have reached the end of their useful life. In fact, this project consists of a complete overhaul of both the inside and outside of the building which includes:

• 9 towers
• commercial areas
• 4 basement levels
• a 3-level underground parking garage



The Government of Canada (GoC) is investing in key strategic assets, including in PDP3, to provide federal public servants with workplaces that are modern, sustainable, healthy, safe, accessible and collaborative.

The project considers GoC priorities, including:

• greening
Gender-based Analysis Plus (GBA+) measures
• universal accessibility
• inclusivity, including reaching out to Indigenous people
• wellness

The renewed PDP3 building is being designed to meet the modern workplace standard for the GoC known as GCworkplace which offers greater flexibility in where and how people work and suits the needs of a post-pandemic, hybrid workforce.