Changes

no edit summary
Line 13: Line 13:  
|-
 
|-
 
| style="border-right: #ffffff 5px solid; padding-right: 0px; padding-left: 0px; padding-bottom: 15px; padding-top: 15px; text-align: center" width="20%" | [[Place_du_Portage_III_-_AWE_-_Project_Overview|<span style="color:#ffffff">'''Project overview'''</span>]]  
 
| style="border-right: #ffffff 5px solid; padding-right: 0px; padding-left: 0px; padding-bottom: 15px; padding-top: 15px; text-align: center" width="20%" | [[Place_du_Portage_III_-_AWE_-_Project_Overview|<span style="color:#ffffff">'''Project overview'''</span>]]  
| style="border-right: #ffffff 5px solid; padding-right: 0px; padding-left: 0px; padding-bottom: 15px; padding-top: 15px; text-align: center" width="20%" | [[OEMD_-_What_We_Do|<span style="color:#ffffff">'''Project phases and milestones'''</span>]]  
+
| style="border-right: #ffffff 5px solid; padding-right: 0px; padding-left: 0px; padding-bottom: 15px; padding-top: 15px; text-align: center" width="20%" | [[Place_du_Portage_III_-_AWE_-_Project_phases_and_milestones|<span style="color:#ffffff">'''Project phases and milestones'''</span>]]  
| style="border-right: #ffffff 5px solid; padding-right: 0px; padding-left: 0px; padding-bottom: 15px; padding-top: 15px; text-align: center" width="20%" | [[OEMD_-_Reports_and_Communications|<span style="color:#ffffff">'''Objectives and benefits'''</span>]]  
+
| style="border-right: #ffffff 5px solid; padding-right: 0px; padding-left: 0px; padding-bottom: 15px; padding-top: 15px; text-align: center" width="20%" | [[Place_du_Portage_III_-_AWE_-_Objectives_and_benefits|<span style="color:#ffffff">'''Objectives and benefits'''</span>]]  
| style="border-right: #ffffff 5px solid; padding-right: 0px; padding-left: 0px; padding-bottom: 15px; padding-top: 15px; text-align: center" width="20%" | [[OEMD_-_Tactical Service Development Process (TSDP)|<span style="color:#ffffff">'''Notices to building occupants'''</span>]]
+
| style="border-right: #ffffff 5px solid; padding-right: 0px; padding-left: 0px; padding-bottom: 15px; padding-top: 15px; text-align: center" width="20%" | [[Place_du_Portage_III_-_AWE_-_Notices to building occupants|<span style="color:#ffffff">'''Notices to building occupants'''</span>]]
| style="border-right: #ffffff 0px solid; padding-right: 0px; padding-left: 0px; padding-bottom: 15px; padding-top: 15px; text-align: center" width="20%" | [[OEMD_-_OC_Bulletin|<span style="color:#ffffff">'''More information'''</span>]]   
+
| style="border-right: #ffffff 0px solid; padding-right: 0px; padding-left: 0px; padding-bottom: 15px; padding-top: 15px; text-align: center" width="20%" | [[Place_du_Portage_III_-_AWE_-_More information|<span style="color:#ffffff">'''More information'''</span>]]   
 
|}
 
|}
 
<!--columns-->
 
<!--columns-->
Line 29: Line 29:     
<!-- Information box -->
 
<!-- Information box -->
{{Main page box (left)|border-color=#73AFC0|background=#73AFC0|title-colour=black|title=<b>Project Overview</b>||content=
+
{{Main page box (left)|border-color=#73AFC0|background=#73AFC0|title-colour=black|title=<b>Project phases and milestones</b>||content=
    
<!--Infos in main main box-->
 
<!--Infos in main main box-->
 
<div style="padding:10px; font-size:120%; line-height: 1.5em;">
 
<div style="padding:10px; font-size:120%; line-height: 1.5em;">
   −
The Place du Portage complex was built in the 1970s. This project consists of a complete overhaul of both the inside and outside of the building which consists of: <br>
+
The project is divided into two (2) phases and will consist of renovations to the inside and the outside of the building. <br>  
 
  −
• 9 towers <br>
  −
• commercial areas<br>
  −
• 4 basement levels<br>
  −
• a 3-level underground parking garage  <br>
   
<br>
 
<br>
As part of planned midlife renewal work, we are doing much-needed renovations, and replacing systems that have reached the end of their useful life.
+
<b>Phase 1</b> (from 2018 to 2024) is already underway. It will address the interior workplace refit of the western towers C1, C2, D and B3, and common base building systems throughout the complex.
 
<br><br>
 
<br><br>
The Government of Canada (GoC) is investing in key strategic assets, including in PDP3, to provide federal public servants with workplaces that are modern, sustainable, healthy, safe, accessible and collaborative.
+
<b>Phase 2</b>(from 2022 to 2027) will address the interior workplace refit eastern towers A1, A2, B1, B2 and E.
 
<br><br>
 
<br><br>
The PDP3 project considers Government of Canada (GC) priorities, including: <br>  
+
<b>Key milestones</b><br>  
   −
greening <br>
+
Planning and design activities for the PDP3 AWR Project started in 2018  <br>
Gender-based Analysis Plus (GBA+) measures <br>
+
Selective interior demolition work of the western towers began in 2019 and was completed in fall 2021<br>
universal accessibility <br>  
+
Construction activities started in early 2022 <br>
inclusivity, including reaching out to Indigenous people <br>
+
The project is expected to be completed in 2027 <br>
• wellness <br>
  −
<br>
  −
The renewed PDP3 building is being designed to meet the modern workplace standard for the GC known as GCworkplace which offers greater flexibility in where and how people work and suits the needs of a post-pandemic, hybrid workforce.
   
<br><br>
 
<br><br>
 
<u><small>[[Place_du_Portage_III_-_Asset_and_Workplace_Evolution_Project| <i>Back to Welcome Page</I>]]</small></u><br>
 
<u><small>[[Place_du_Portage_III_-_Asset_and_Workplace_Evolution_Project| <i>Back to Welcome Page</I>]]</small></u><br>
238

edits