Difference between revisions of "GC EARB Presenter Template – SSC Appendix 3 Guidelines"

From wiki
Jump to navigation Jump to search
Line 1: Line 1:
Security Profile, Availability, and Disaster Recovery Information:
+
 
 +
'''Use this document as guidance to help complete SSC Appendix 3 slides'''
 +
 
 +
'''Security Profile, Availability, and Disaster Recovery Information:'''
 
<br>
 
<br>
 
<br>
 
<br>
Security Profile: Provide the security profile for the solution (eg. PBMM, PBHM, etc). If the solution includes multiple components with different security profiles, include all security profiles.
+
'''Security Profile:''' Provide the security profile for the solution (eg. PBMM, PBHM, etc). If the solution includes multiple components with different security profiles, include all security profiles.
 
<br>
 
<br>
 
<br>
 
<br>
Maximum Allowable Unplanned downtime: provide expected maximum allowable downtime in hours per year if system is expected to run 24/7, or general availability hours if the system is expected to run during business hours and have downtime otherwise.
+
'''Maximum Allowable Unplanned downtime:''' provide expected maximum allowable downtime in hours per year if system is expected to run 24/7, or general availability hours if the system is expected to run during business hours and have downtime otherwise.
 
<br>
 
<br>
 
<br>
 
<br>
Availability requirements: Provide an estimate for availability requirements: Medium availability is 95%, High availability is >=99%
+
'''Availability requirements:''' Provide an estimate for availability requirements: Medium availability is 95%, High availability is >=99%
 
<br>
 
<br>
 
<br>
 
<br>
Disaster Recovery: select expected disaster recovery needs
+
'''Disaster Recovery:''' select expected disaster recovery needs
 
<br>
 
<br>
 
<br>
 
<br>
• Hot Site: Facility and equipment are set up and ready to go, with either synchronous or asynchronous data replication. It is available and running 24/7.
+
:• Hot Site: Facility and equipment are set up and ready to go, with either synchronous or asynchronous data replication. It is available and running 24/7.
 +
:• Warm Site: Equipment is available and configured. Latest application data must loaded or restored.
 +
:• Cold Site: Available space/facility where you need to set up the equipment, connectivity, load the software and data.
 +
:• None: best effort disaster recovery.
 
<br>
 
<br>
• Warm Site: Equipment is available and configured. Latest application data must loaded or restored.
 
 
<br>
 
<br>
• Cold Site: Available space/facility where you need to set up the equipment, connectivity, load the software and data.
+
'''Authentication:''' select the authentication method from the options below. DCAM, ICM/ECM, or Sign in Canada are the preferred methods:
 
<br>
 
<br>
• None: best effort disaster recovery.
 
 
<br>
 
<br>
 +
:• DCAM (Active Directory solution using ADFS)
 +
:• ICM/ECM – GCKey, MyKey
 +
:• Sign in Canada
 +
:• Other: Specify the authentication method if none of the above are being used.
 
<br>
 
<br>
Authentication: select the authentication method from the options below. DCAM, ICM/ECM, or Sign in Canada are the preferred methods:
 
 
<br>
 
<br>
 +
'''Hosting Solution:''' Specify all hosting options:
 
<br>
 
<br>
• DCAM (Active Directory solution using ADFS)
 
 
<br>
 
<br>
• ICM/ECM GCKey, MyKey
+
:o End State Data Centre (specify EDC)
 +
:o Legacy Data Centre (specify specific data centre)
 +
:o Cloud specify cloud solution
 
<br>
 
<br>
• Sign in Canada
 
 
<br>
 
<br>
• Other: Specify the authentication method if none of the above are being used.
+
'''Workload Migration:''' Is any workload migrating out of legacy data centres: Yes/No
 
<br>
 
<br>
 
<br>
 
<br>
Hosting Solution: Specify all hosting options:
+
'''Network Details:'''
 
<br>
 
<br>
 
<br>
 
<br>
o End State Data Centre (specify EDC)
+
:• '''Network Connectivity:''' Specify the network(s) the solution will use: eg. GCNet, Science Net, GCSI, etc.
 +
:• '''Solution Sensitivity to Network Delay:'''o Very High (high quality or large number of voice, video and real-time streaming traffic)
 +
:o High (suitable for voice and video, sensitive synchronous applications such as Citrix)
 +
:o Medium (suitable for some synchronous applications)
 +
:o Low (suitable for asynchronous applications)
 +
:o Provide the minimum Required Bandwidth
 +
• '''Network Geographical Distribution:''' Specify the distribution of the solution:
 +
:o Low geographical spread (100 km or less) between application hosting and users
 +
:o Moderate geographical spread (500 km or less) between application hosting and users
 +
:o Regional geographical spread (up to 1500 km) between application hosting and users
 +
:o National geographical spread (Canada-wide) between application hosting and users
 +
:o Global spread between application hosting and users
 +
• '''Network Traffic:''' Select all applicable options for the kind of traffic expected over the network for this solution
 +
:o Video
 +
:o Audio
 +
:o Data
 +
:o Interactive (APIs)
 +
Cloud Details:
 
<br>
 
<br>
o Legacy Data Centre (specify specific data centre)
+
• List the solution’s relevant Cloud Usage Profiles
<br>
+
• List the solution’s relevant Cloud Connection Patterns
o Cloud – specify cloud solution
+
Is SCED Needed? Yes/No
<br>
+
Has the department been prioritized? If Yes, on which architecture?
<br>
 
Workload Migration: Is any workload migrating out of legacy data centres: Yes/No
 
<br>
 
<br>
 
Network Details:
 
<br>
 
<br>
 
Network Connectivity: Specify the network(s) the solution will use: eg. GCNet, Science Net, GCSI, etc.
 
<br>
 
• Solution Sensitivity to Network Delay:
 

Revision as of 18:05, 7 May 2020

Use this document as guidance to help complete SSC Appendix 3 slides

Security Profile, Availability, and Disaster Recovery Information:

Security Profile: Provide the security profile for the solution (eg. PBMM, PBHM, etc). If the solution includes multiple components with different security profiles, include all security profiles.

Maximum Allowable Unplanned downtime: provide expected maximum allowable downtime in hours per year if system is expected to run 24/7, or general availability hours if the system is expected to run during business hours and have downtime otherwise.

Availability requirements: Provide an estimate for availability requirements: Medium availability is 95%, High availability is >=99%

Disaster Recovery: select expected disaster recovery needs

• Hot Site: Facility and equipment are set up and ready to go, with either synchronous or asynchronous data replication. It is available and running 24/7.
• Warm Site: Equipment is available and configured. Latest application data must loaded or restored.
• Cold Site: Available space/facility where you need to set up the equipment, connectivity, load the software and data.
• None: best effort disaster recovery.



Authentication: select the authentication method from the options below. DCAM, ICM/ECM, or Sign in Canada are the preferred methods:

• DCAM (Active Directory solution using ADFS)
• ICM/ECM – GCKey, MyKey
• Sign in Canada
• Other: Specify the authentication method if none of the above are being used.



Hosting Solution: Specify all hosting options:

o End State Data Centre (specify EDC)
o Legacy Data Centre (specify specific data centre)
o Cloud – specify cloud solution



Workload Migration: Is any workload migrating out of legacy data centres: Yes/No

Network Details:

Network Connectivity: Specify the network(s) the solution will use: eg. GCNet, Science Net, GCSI, etc.
Solution Sensitivity to Network Delay:o Very High (high quality or large number of voice, video and real-time streaming traffic)
o High (suitable for voice and video, sensitive synchronous applications such as Citrix)
o Medium (suitable for some synchronous applications)
o Low (suitable for asynchronous applications)
o Provide the minimum Required Bandwidth

Network Geographical Distribution: Specify the distribution of the solution:

o Low geographical spread (100 km or less) between application hosting and users
o Moderate geographical spread (500 km or less) between application hosting and users
o Regional geographical spread (up to 1500 km) between application hosting and users
o National geographical spread (Canada-wide) between application hosting and users
o Global spread between application hosting and users

Network Traffic: Select all applicable options for the kind of traffic expected over the network for this solution

o Video
o Audio
o Data
o Interactive (APIs)

Cloud Details:
• List the solution’s relevant Cloud Usage Profiles • List the solution’s relevant Cloud Connection Patterns • Is SCED Needed? Yes/No • Has the department been prioritized? If Yes, on which architecture?