Difference between revisions of "Place du Portage III AWR Project phases and milestones"

From wiki
Jump to navigation Jump to search
 
(7 intermediate revisions by 2 users not shown)
Line 1: Line 1:
<!--765e-->
+
'''<big>IMPORTANT: Please note that this site has been replaced by the new [https://www.gcpedia.gc.ca/wiki/PDP3AWR_Home PDP3 AWR Project Portal on GCpedia]; no further updates will be made.</big>'''<!--765e-->
 
[[Image:PDP3_Welcome_Page1.jpg|center|link=]]
 
[[Image:PDP3_Welcome_Page1.jpg|center|link=]]
 
<br>
 
<br>
Line 5: Line 5:
 
<!--French-->
 
<!--French-->
 
{| class="FCK__ShowTableBorders" style="border:white solid 1px; background-color:#551155" width="10%" align="center"
 
{| class="FCK__ShowTableBorders" style="border:white solid 1px; background-color:#551155" width="10%" align="center"
| style="padding-right: 5px; padding-left: 5px; padding-bottom: 10px; padding-top: 10px; text-align: center;" | [[Place_du_Portage_III_AWR_French|<span style="color:#ffffff"> '''Français'''</span>]]  
+
| style="padding-right: 5px; padding-left: 5px; padding-bottom: 10px; padding-top: 10px; text-align: center;" | [[Renouvellement_de_Portage_III_Phases_du_projet_et_étapes_importantes|<span style="color:#ffffff"> '''Français'''</span>]]  
 
|} <br>
 
|} <br>
  
Line 33: Line 33:
 
<div style="padding:10px; font-size:120%; line-height: 1.5em;">
 
<div style="padding:10px; font-size:120%; line-height: 1.5em;">
  
The project is divided into two (2) phases and will consist of renovations to the inside and the outside of the building. <br>  
+
The project is divided into two phases and consists of a complete overhaul of both the inside and outside of the building. <br>  
 
<br>
 
<br>
<b>Phase 1</b> (from 2018 to 2024) is already underway. It will address the interior workplace refit of the western towers C1, C2, D and B3, and common base building systems throughout the complex.
+
<b>Phase 1</b> (from 2018 to 2027) is underway. It will address the interior workplace refit of the western towers (C1, C2, D and B3) by 2024, and common base building systems throughout the complex by 2027.
 
<br><br>
 
<br><br>
<b>Phase 2</b>(from 2022 to 2027) will address the interior workplace refit eastern towers A1, A2, B1, B2 and E.
+
<b>Phase 2</b> (from 2024 to 2027) will address the interior workplace refit eastern towers (A1, A2, B1, B2 and E).
 
<br><br>
 
<br><br>
 
<b>Key milestones</b><br>  
 
<b>Key milestones</b><br>  
  
 
• Planning and design activities for the PDP3 AWR Project started in 2018  <br>
 
• Planning and design activities for the PDP3 AWR Project started in 2018  <br>
• Selective interior demolition work of the western towers began in 2019 and was completed in fall 2021<br>
+
• Selective interior demolition work of the western towers began in 2019 and was completed in 2021<br>
 
• Construction activities started in early 2022 <br>
 
• Construction activities started in early 2022 <br>
 
• The project is expected to be completed in 2027 <br>
 
• The project is expected to be completed in 2027 <br>

Latest revision as of 15:24, 29 March 2023

IMPORTANT: Please note that this site has been replaced by the new PDP3 AWR Project Portal on GCpedia; no further updates will be made.

PDP3 Welcome Page1.jpg


Français


Project overview Project phases and milestones Objectives and benefits Notices to building occupants More information

Project phases and milestones

The project is divided into two phases and consists of a complete overhaul of both the inside and outside of the building.

Phase 1 (from 2018 to 2027) is underway. It will address the interior workplace refit of the western towers (C1, C2, D and B3) by 2024, and common base building systems throughout the complex by 2027.

Phase 2 (from 2024 to 2027) will address the interior workplace refit eastern towers (A1, A2, B1, B2 and E).

Key milestones

• Planning and design activities for the PDP3 AWR Project started in 2018
• Selective interior demolition work of the western towers began in 2019 and was completed in 2021
• Construction activities started in early 2022
• The project is expected to be completed in 2027