Difference between revisions of "Place du Portage III AWR Project phases and milestones"

From wiki
Jump to navigation Jump to search
Line 33: Line 33:
 
<div style="padding:10px; font-size:120%; line-height: 1.5em;">
 
<div style="padding:10px; font-size:120%; line-height: 1.5em;">
  
The project is divided into two (2) phases and consists of a complete overhaul of both the inside and outside of the building. <br>  
+
The project is divided into two phases and consists of a complete overhaul of both the inside and outside of the building. <br>  
 
<br>
 
<br>
 
<b>Phase 1</b> (from 2018 to 2024) is already underway. It will address the interior workplace refit of the western towers C1, C2, D and B3, and common base building systems throughout the complex.
 
<b>Phase 1</b> (from 2018 to 2024) is already underway. It will address the interior workplace refit of the western towers C1, C2, D and B3, and common base building systems throughout the complex.

Revision as of 21:37, 21 April 2022

PDP3 Welcome Page1.jpg


Français


Project overview Project phases and milestones Objectives and benefits Notices to building occupants More information

Project phases and milestones

The project is divided into two phases and consists of a complete overhaul of both the inside and outside of the building.

Phase 1 (from 2018 to 2024) is already underway. It will address the interior workplace refit of the western towers C1, C2, D and B3, and common base building systems throughout the complex.

Phase 2 (from 2022 to 2027) will address the interior workplace refit eastern towers A1, A2, B1, B2 and E.

Key milestones

• Planning and design activities for the PDP3 AWR Project started in 2018
• Selective interior demolition work of the western towers began in 2019 and was completed in 2021
• Construction activities started in early 2022
• The project is expected to be completed in 2027